ESI processing not enabled ESI processing not enabled
ESI processing not enabled

Tag Archives: Camaro

  • Hands on Cars Episode 1- How to Inspect and Evaluate a Project Car

    The first episode of Hand on Cars, from Eastwood and Kevin Tetz, body work expert, paint wizard and all around car guy. In the first episode Kevin takes you through the process of inspecting a prospective project car before buying it. The car in question? One of the nearly quarter million 1978 Camaros Chevy built, but this one is a Z28 which makes it one of only about 50,000.
  • Hands on Cars Episode 11- How to lay filler and set body panel gaps

    In this episode of Hands on Cars, Kevin calls up a bunch of his buddies to help finish the body work on the 1978 Chevy Camaro Z28 Zed Sled. Unlike your knucklehead friends, Kevin’s friends just happen to be a who’s who of show car paint, body, engine and fabrication guys from around the country. With all of them pitching in together, they get weeks work worth of body work done in just a day. Once the body panels are all straight, and the panel gaps are perfect Kevin shoots the whole car in Eastwood Contour high build polyester primer/surfacer. Kevin also visits Wheels in Motion, a restoration shop shop in a converted car dealership from the 1930s. There he takes a ride in a low mile, unrestored, 1959 Chevy Impala that was originally bought at the site new by the original owner.
  • Top 10 Pony Cars at SEMA

    We take so many pictures and video over the course of the week SEMA takes over Las Vegas it takes us almost a year to get through all of the media! While going through our photos we decided to put together this list of our favorites from this past years show! Here are 10 cars spotted on the floor, in no particular order, which show it hasn’t already all been done.
  • Removing Rusty Floor Pans (Hands On Cars E.03)

    Episode Summary:

    Using a rotisserie, an Eastwood MIG 175 welder, replacement stampings from National Part Depot and a BFH Kevin gets to work replacing the floorpans on the Zed Sled 1978 Chevy Camaro. After stripping the body shell inside and out, it’s apparent the floors are in much worse shape than initially thought. Luckily the under braces are still structurally sound, and the GM F-body has great aftermarket support, so replacement sheet metal is available. The toe boards, the area right under the dashboard, are not available but are relatively simple to make flat metal pieces. The next step is drilling out the spot welds on the braces, and marking and cutting the old floor out. Then the new one is laid so the location of the braces and edges can be marked with a sharpie.

    Back in the shop Kevin fits the car to the floorpans using the angle grinder, cut off wheel and a big freakin’ hammer. Next he copies the location of the original factory welds all the way around, and drills about a million holes. After a little more cutting and banging and drilling, the new pan is ready to go in. A handful of sheetmetal screws hold it in place temporarily, and a million little holes get MIG welded through to what’s left of the old floor.

    How to Remove & Replace Floor Pans: A Step-by-Step

    In this episode of Hands on Cars Kevin shows us how to remove the rusty old floor pans on the 1978 Chevy Camaro Z28 Zed Sled project car and fit new replacement metal. After stripping the car down to the bone, it become apparent things are worse than expected.

    step 1


    1: New floorboards were needed from National Parts Depot, as well as some custom fab work to replace the rusted out toe boards directly under where your feet go.

    step 2

     

    step 2-2

     

    2. When stripping the car, be sure to save things like rusty old brake and fuel lines to use as a template later for the new ones.

    step 3

     

    3: Eastwood PRE painting prep cleaner is used to wipe off all the protective rustproof coating on the new floorpan so it can be written on with a Sharpie and welded.

    step 4

     

    4: Lay the new metal on top of the old and it should be an exact match. Trace around the edges of new piece on the old floor and you instantly have a guide for cutting.

    step 5

     

    5: Cut out the old floor - There are several different ways to take out old floor pans and it depends on your budget and the car. If you have a plasma cutter you can make short work out of cutting out the old floor, if not a cut off wheel in an angle grinder, and maybe a Sawzall will do the same job, it will just take longer. Leave an inch or so of old metal all the way around to weld the new floor to.

    step 6

     

    6: Be extra careful to cut around the structural floor braces, you are going to want to reuse them if they are in good shape.

    step 7

     

    7: Once most of the floor is out, drill the spot welds holding the braces to what’s left of the floor with an Eastwood Spot Weld Cutter. When the spot welds are out finish the removal with an air chisel in just seconds, or manually with the big freakin’ hammer and an old chisel.

    step 8

     

    8: Use a handful of sheet metal screws and securely attach the new floor to the old edges.

    Screen shot 2014-10-29 at 2.16.33 PM

     

    9: Working from the underside, trace the edges of the old floor on the new one so you can more easily locate all the holes for the welds.

    step 9

     

    10: Take the new floor back out, and mark the location to drill for your eleventy billion plug weld holes. The structure of the unibody relies on the approximately 7000 plug welds GM used in the factory to tie it all together. Drilling holes in the new floor, and welding through to the old from the top helps pull it all together as you weld, for a more solid and water tight job.

    step 10

     

    11: Start drilling holes around the outside edges of the new floor, and the inner areas where it connects to the cross braces. Try to get as many welds as the factory used, and in the same locations for maximum structural rigidity. Make sure you have a good sharp bit before you start, in fact make sure you have a several spares as well.

    step 11

     

    12: Next finish prepping the edges of the old floor and the braces to be welded to. Eastwood Rust Encapsulater is a great preemptive measure to spray on the cross braces and any areas that you won’t be able to get at later when the floor is in.

    step 12

     

    13: The areas to be welded to should have been masked off first, those will be coated with an Eastwood self-etching weld through zinc primer which is made for situations exactly like this.

    step 12

     

    14: Temporarily attach the floor again with sheet metal screws, then start welding. The actual number of holes and welds is more like 300 vs than 7,000, but it still feels like a heck of a lot.

    step 14

    That's It

    And that’s it, your project car has new floors, once you finish all those little welds. There is still the matter of the toe boards, but that is a job for another day.

    follow all of the Hands on Cars episodes!
    CLICK HERE TO SUBSCRIBE TO

    EASTWOOD'S YOUTUBE CHANNEL

  • Hands On Cars Ep. 4 - Replacing a Rusty Roof

    In this episode Kevin is all about undoing the errors of some previous owner of the Zed Sled Camaro Z28. He finishes up with the rust replacement on the bottom of the car, and tackles the cause of all the rot in the first place: A leaking aftermarket sunroof installation.

Items 1 to 5 of 19 total

  1. 1
  2. 2
  3. 3
  4. 4
ESI processing not enabled