The Garage™

DO THE JOB RIGHT
DO THE JOB RIGHT
DO THE JOB RIGHT
Engine parts laid out after media blasting
Eastwood Projects
Bryan Joslin

Project Sunny – Blast Therapy and Choosing the Right Black

The winter holiday season can be a tough time to pull away from family to work on personal projects. Unless, that is, your project lives at work. When the normal workflow falls apart with everyone’s vacation schedule, there’s usually a little spare time to sneak away to the shop. I

Read More »
Project Sunny engine disassembled
Eastwood Projects
Bryan Joslin

Project Sunny – Tearing Down the Engine

In our last installment, we took the engine and transmission out of the Range Rover’s chassis and separated the two. For now, the transmission is sitting on the floor, but we did mount the engine to a proper stand. Over the course of a couple weekends, we’ve now stripped the

Read More »
Eastwood Project Sunny Range Rover
Eastwood Projects
Bryan Joslin

Project Sunny – Body on Rotisserie and Engine Removed

Winter is fast approaching, and that means only one thing. No, not Christmas shopping, though come to think of it, I should probably add that to the list. I was actually referring to the slate of projects I plan to tackle during the months without car shows and other events.

Read More »
Eastwood Projects
Bryan Joslin

Project Sunny – Assessing the Rusty Chassis

Over the last month or so, we’ve been busy peeling off the components attached to the rusty chassis of our 1993 Range Rover project. And we know, from a distance, this thing looks pretty bad. But the further we dig in, the more we’re surprised by just how solid the

Read More »
Range Rover Classic brake system components
Eastwood Projects
The Garage

Project Sunny – Storing Brake Lines and Fuel Lines For Restoration

A particular challenge of restoring a less-then-common vehicle is that not every worn-out part can be ordered from a catalog. Sometimes you need to hold onto your old parts for reference so you can re-make them yourself later. That’s the case with the original steel fuel lines and brake lines

Read More »
Project Sunny IASIP Range Rover
Eastwood Projects
The Garage

Project Sunny – Episode 9: We Have (Body) Lift Off

Every project seems to eventually reach some insurmountable obstacle. For our Range Rover restoration project, the hurdle we couldn’t seem to jump was getting the body off the frame. Not that we didn’t know how; it was a matter of figuring out what we were going to with the body

Read More »
Eastwood Projects
Bryan Joslin

Project Sunny – Episode 8: Reworking the Cargo Floor

Do the job right! That’s been Eastwood’s motto for a long time. Taking that motto to heart, I couldn’t walk away from the previous episode of Project Sunny feeling right. Sure, I got the two pieces of the floor stitched together into one piece, but I wasn’t happy with how

Read More »